Myke's Photo Gallery: 1001 North 2nd - Construction Update #2
January, 2009


COPYRIGHT NOTICE:
All photos within this webpage are copyright 2011, Myke Olson, unless otherwise noted. All rights reserved.
You may not copy or link to these images on the web, in print, or any other media without prior permission from the copyright holder.


Tiled Master Bath with Whirlpool tub in place
Tiled Master Bath with Whirlpool tub in place
New tile floors
New tile floors
New tile floors and glass brick on front of tub
New tile floors and glass brick on front of tub
Shower and tub area
Shower and tub area
New Electrical Sub-Panel
New Electrical Sub-Panel
New feeds into sub-panel
New feeds into sub-panel
New laundry connections
New laundry connections
New access panel from Laundry Room
New access panel from Laundry Room
Server rack placed in Basement
Server rack placed in Basement
Knob and Tube Wiring
Knob and Tube Wiring
Knob and Tube Wiring
Knob and Tube Wiring
New Main Electrical Panel outside
New Main Electrical Panel outside
New 200 amp circuit from PG&E, raised to the proper height above the roof
New 200 amp circuit from PG&E, raised to the proper height above the roof
New conduit from main electrical panel
New conduit from main electrical panel
Main Electrical Panel
Main Electrical Panel
Master Bath primed white
Master Bath primed white
Master Bath painting
Master Bath painting
New vanity for Master Bath
New vanity for Master Bath
Garage is completely packed
Garage is completely packed